FORGOT YOUR DETAILS?

  • 3 ROOM
  • $26888
    per package
  • Design Consultation
  • Space Planning & Furniture Layout
  • 3D Perspective Drawings
  • Material & Colour Proposal
  • Project Management
  • Site Supervision
  • Demolition Works
  • Demolish existing flooring for living & dining
  • Demolish existing flooring for store
  • Demolish existing kitchen flooring
  • Demolish existing Kitchen wall tiles till ceiling height
  • Demolish existing 02 Bathrooms flooring
  • Demolish existing 02 Bathroom wall tiles till ceiling height
  • Demolish existing skirting for whole unit
  • Dismantle sanitary ware & accessories for 02 Bathrooms
  • Haulage services & debris disposal
  • Plumbing Works
  • Standard cold water copper piping for whole unit
  • Connection of inlet / outlet for kitchen sink
  • Supply labour to install 02 sets of water closet
  • Supply labour to install 02 sets of wash basin
  • Provide labour to install accessories for 02 Bathrooms
  • Provide labour to install 01 no. of storage heater
  • Masonry Works
  • Homogeneous flooring c/w skirting at Living & Dining ( 600mm x 600mm )
  • Overlay vinyl flooring for all Bedrooms
  • Ceramic wall tiles till ceiling height for Kitchen
  • Homogeneous non-slip flooring at Kitchen
  • Water proofing membrane at Kitchen
  • Ceramic wall tiles till ceiling height for Main Bathroom
  • Ceramic wall tiles till ceiling height for Common Bathroom
  • Homogeneous non-slip flooring at Main Bathroom
  • Homogeneous non-slip flooring at Common Bathroom
  • Water proofing membrane for 02 Bathrooms
  • 50mm cabinet base w/ tile finish
  • Install 02 x aluminium bifold doors for bathroom
  • Miscellaneous Works
  • Cardboard protection for affected areas
  • Chemical washing & General cleaning upon completion
  • Whole unit painting with Nippon Emulsion paint
  • 4 ROOM
  • $29888
    per package
  • Design Consultation
  • Space Planning & Furniture Layout
  • 3D Perspective Drawings
  • Material & Colour Proposal
  • Project Management
  • Site Supervision
  • Demolition Works
  • Demolish existing flooring for living & dining
  • Demolish existing flooring for store
  • Demolish existing kitchen flooring
  • Demolish existing Kitchen wall tiles till ceiling height
  • Demolish existing 02 Bathrooms flooring
  • Demolish existing 02 Bathroom wall tiles till ceiling height
  • Demolish existing skirting for whole unit
  • Dismantle sanitary ware & accessories for 02 Bathrooms
  • Haulage services & debris disposal
  • Plumbing Works
  • Standard cold water copper piping for whole unit
  • Connection of inlet / outlet for kitchen sink
  • Supply labour to install 02 sets of water closet
  • Supply labour to install 02 sets of wash basin
  • Provide labour to install accessories for 02 Bathrooms
  • Provide labour to install 01 no. of storage heater
  • Masonry Works
  • Homogeneous flooring c/w skirting at Living & Dining ( 600mm x 600mm )
  • Overlay vinyl flooring for all Bedrooms
  • Ceramic wall tiles till ceiling height for Kitchen
  • Homogeneous non-slip flooring at Kitchen
  • Water proofing membrane at Kitchen
  • Ceramic wall tiles till ceiling height for Main Bathroom
  • Ceramic wall tiles till ceiling height for Common Bathroom
  • Homogeneous non-slip flooring at Main Bathroom
  • Homogeneous non-slip flooring at Common Bathroom
  • Water proofing membrane for 02 Bathrooms
  • 50mm cabinet base w/ tile finish
  • Install 02 x aluminium bifold doors for bathroom
  • Miscellaneous Works
  • Cardboard protection for affected areas
  • Chemical washing & General cleaning upon completion
  • Whole unit painting with Nippon Emulsion paint
  • 5 ROOM
  • $32888
    per package
  • Design Consultation
  • Space Planning & Furniture Layout
  • 3D Perspective Drawings
  • Material & Colour Proposal
  • Project Management
  • Site Supervision
  • Demolition Works
  • Demolish existing flooring for living & dining
  • Demolish existing flooring for store
  • Demolish existing kitchen flooring
  • Demolish existing Kitchen wall tiles till ceiling height
  • Demolish existing 02 Bathrooms flooring
  • Demolish existing 02 Bathroom wall tiles till ceiling height
  • Demolish existing skirting for whole unit
  • Dismantle sanitary ware & accessories for 02 Bathrooms
  • Haulage services & debris disposal
  • Plumbing Works
  • Standard cold water copper piping for whole unit
  • Connection of inlet / outlet for kitchen sink
  • Supply labour to install 02 sets of water closet
  • Supply labour to install 02 sets of wash basin
  • Provide labour to install accessories for 02 Bathrooms
  • Provide labour to install 01 no. of storage heater
  • Masonry Works
  • Homogeneous flooring c/w skirting at Living & Dining ( 600mm x 600mm )
  • Overlay vinyl flooring for all Bedrooms
  • Ceramic wall tiles till ceiling height for Kitchen
  • Homogeneous non-slip flooring at Kitchen
  • Water proofing membrane at Kitchen
  • Ceramic wall tiles till ceiling height for Main Bathroom
  • Ceramic wall tiles till ceiling height for Common Bathroom
  • Homogeneous non-slip flooring at Main Bathroom
  • Homogeneous non-slip flooring at Common Bathroom
  • Water proofing membrane for 02 Bathrooms
  • 50mm cabinet base w/ tile finish
  • Install 02 x aluminium bifold doors for bathroom
  • Miscellaneous Works
  • Cardboard protection for affected areas
  • Chemical washing & General cleaning upon completion
  • Whole unit painting with Nippon Emulsion paint

VNA Headquaters

432 Balestier Road, Public Mansions, #01-438 S(329813)

E : enquiries@vnadesign.com.sg

T : +65 6252 2208

P :  +65 97890750 / +65 90605016

Contact

  • Drop files here or
    Accepted file types: jpg, pdf, jpeg.

VNA Design

We provide premium interior design solutions commercial and residentially.

Questions? CALL: +65 97980750 / +65 90605016

TOP
Main menu